Sunday, January 26, 2020

The Photovoltaic Energy Calculation Engineering Essay

The Photovoltaic Energy Calculation Engineering Essay We used the program PVSYST in order to calculate accurately the output of our photovoltaic installation. PVSYST was the only program we had access to and it is a very widely known industrial program for sizing and designing photovoltaic systems. We used the most up to date version of 5.0.6. Procedure First from the main menu above we choose project design and we select the stand alone system because ours is not connected with an existing grid (i.e. electrical generator) In order to create a project in PVSYST, here is the Eco-friendly bulk carrier, we have to define: The project name, which will identify the project in the file list in our data library. The geographical location. The hourly Meteo file, which is given from the program. A geographical site is defined by: its name, country, and world region, its geographical co-ordinates: latitude, longitude, altitude and time-zone, Monthly meteorological data. To be used in the simulation, the minimum meteorological data include: the monthly Global horizontal irradiation Monthly averages of the ambient temperature. Meteo values are displayed and easily defined on the screen. It is to be noted that for the verification of rather uncertain data, the clearness index Kt is also displayable, which is the irradiation actually received on earth, normalised to extra-terrestrial irradiation in monthly values. The monthly average of Kt should usually lie between about Kt = 0.25 and Kt = 0.75 at any place (PVSYST defaults). Monthly meteo values can be used as a basis for the generation of synthetic daily data. Then we generate a graph for the specific site (i.e. Broome): Where, the blue line is the clear day model (irradiation values with clear sky). The above graph shows us graphically the irradiation sum per month (diffuse and global) with daily change values. The Clearness Index Kt for Broome: We can see that the values range from 0.25 to 0.75 The ambient temperature changes through the year. The above graphs were generated by the program from the below table: Also it is interesting to show the solar path at Broome or what is the solar height with respect of the plane through the day in order to understand how the sun moves from east to west. The graph also shows some landmark dates (denoted as 1 to 7) where the sun changes height: Our next step to the program is to find the albedo Coefficient: The albedo coefficient is the fraction of global incident irradiation reflected by the ground in front of a tilted plane. This effect takes place during the reversal computation of the horizontal irradiation onto a tilted plane. The albedo seen by the plane is of course null for a horizontal plane, and increases with tilt. In the project definition, the albedo values can be adjusted each month in order to take any possible snow-cover into consideration. The value usually admitted in the urban localities is of the order of 0.14 to 0.22, and can go up till 0.8 for a snow-cover. Ideally, the best value is obtained by a direct measurement on the site. But in practice, except for vertical planes, this value does not take on any great importance as the albedo component is relatively weak in the incident global irradiation (this contribution can be visualised in the results of the simulation). The following table gives some usual values for the albedo: We used the 0.35 value of the Albedo coefficient because it matches on our material. After defining the above values through the program we proceeded to the orientation of our PV plane. Our project consist a fixed tilted plane (The plane tilt is defined as the angle between the plane and the horizontal), because we considered placing the panels at the hatches due to the fact that they would be exposed all day to the suns radiation. PVs are placed onto the hatches of the ship with zero tilt (Azimuth is zero as well because it doesnt affect the global on collector plane output. In northern hemisphere, the plane azimuth is defined as the angle between south and collector plane. In southern hemisphere, the plane azimuth is defined as the angle between north and collector plane). As the program calculated, our loss with respect to an optimum orientation is 3.8% and the available irradiation on this tilted plane is 2370kWh/m2 We also considered using various configurations of panels as to maximise the output per m2 before choosing the above configuration. The below configurations was rejected due to the sun is changing place constantly throughout the day and the ships movement reinforces the situation, we decided that the best configuration was the above due to sturdy design (one panel placed along the hatch), high efficiency (sun always hit the panel at any time) and simple installation. Using two panels on each hatch half, tilted for 25o each having an output of 2445 kWh/m2 and the loss to an optimum orientation is 0.7%. Sun hit the panels only east and west when the ship goes north. (Highest efficiency, complex design, not easy installation). Using two panels on each half, tilted for above 25o the output is greatly decreased and we have great loss to an optimum orientation. The next step is to calculate the near shadings effect or shading. Near shadings are partial shadings which affect only a part of the field. The shaded part changes during the day and over the seasons. We call shading factor the ratio of the illuminated part to the total area of the field, or inversely shading loss is its complement. Through the construction/perspective tool we created a model of the ship from the ships particulars with the PVs installed on it in order to calculate the shading loss we have in various positions of the ship: The real effect of partial shadings on the electrical production of the PV field is non-linear, and depends on the interconnections between the modules. In the PV array, the current of each cell string is limited by the current of the worst cell in the series. That is, when one only cell is shaded the entire string is strongly affected (which has also dramatic effects on the I/V(current/voltage) characteristics of the whole array). Even with by-pass protection diodes, this string does not participate more than slightly in the production of the PV array. This phenomenon is too complex to be treated in great detail . Nevertheless, the program provides a simplified method, giving the possibility of partitioning the field into rectangles, each of which supposed to represent a string of modules in series. Then it calculates a Shading factor according to strings, stating that as soon as a string is hit by a shadow, the entire string (rectangle) is considered as electrically unproductive. A lthough not perfect, this approach should give an upper limit for the real shading loss evaluation. In practice, one often observe that (except for regular arrangements like sheds), this upper limit is not so far from the lower limit (that is, the linear loss). And the losses percentage due to shading in any sun height. After we define the natural parameters, we proceeded to the system consumption during a month in the specific site (BROOME). We cannot apply the maximum load 669.64 kW because it is the 100% and it is impossible to achieve it, but we apply an acceptable amount of about 20% of the max output which is 140Kw as a fixed load for 12 hours. After that we proceed to battery set and module selection: Where: LOL Loss-of-load probability This value is the probability that the users needs cannot be supplied (i.e. the time fraction when the battery is disconnected due to the Low charge regulator security). It may be understood as the complement of the Solar fraction (although it is described in terms of time rather than energy). During the sizing process, the LOL requirement allows for determining the PV array size needed, for a given battery capacity. Here the default program value is 5% which is acceptable. Autonomy and battery sizing: In the Presizing process, the proposed battery pack capacity is determined according to the required autonomy of the system, given in days. The autonomy is defined as the time during which the load can be met with the battery alone, without any solar inputs, starting of course from a full charged battery state. With non-constant loads (seasonal or monthly definition, weekly use), this is accounted as the worst case over the year. The calculation takes the minimum state of charge (SOC) disconnecting threshold, and the battery energy efficiency into account. For our project we decided that 4 days is enough autonomy for our ship. Battery Voltage Choice In a stand-alone PV system with direct coupling to the user (without inverter), the battery voltage determines the distribution voltage. As now many DC appliances can be found as well in 24V as in 12V, this choice should be made according to system and/or appliance power, as well as the extension of the planned distribution grid to minimise the ohmic wiring losses. This choice should be done from the early planning of an installation, since the existing appliance voltage usually cannot be changed, and voltage translators will be expensive and not 100% efficient. The rated distribution values could be chosen according to the following criteria (inverter supposed directly connected on the battery pack): 12V: little systems for lighting and TV: Appliance max power 24V: medium size, with fridge and little appliances, or wiring extension to more than 10 m. Appliance max power 48V: special industrial or agricultural use Appliance max power Higher powers require either high DC voltages (special appliances) or AC feeding through inverter. Here we choose 440V The module which we choose was the highest output monocrystalline silicon module in the program database, from SunPower company, constructed in 2009 the specifications of the module are: The batteries specification ,model and Manufaturer: Continuing: below is a brief sketch of the system The battery operating temperature was set to a fixed value of 20oC and the program let us use a default regulator with a DC-DC converter which specs are above. Array Losses Array losses in PVSYST program: Array loss parameters are initially set to reasonable default values by the program, so that modifications only need to be performed during a second step of the system study. PVSYST treats in detail the following loss types in a PV array: Thermal losses Ohmic wiring losses Module quality losses Mismatch losses Incidence angle (IAM) losses. In the simulation results, the effect of each loss will be available in hourly, daily or monthly values. They may be visualized on the Loss diagram. Array Thermal losses Thermal Model The thermal behaviour of the field which strongly influences the electrical performances is determined by a thermal balance between ambient temperature and cells heating up due to incident irradiance: U  · (Tcell Tamb) = Alpha  · Ginc  · (1 Effic) Where Alpha is the absorption coefficient of solar irradiation, and Effic is the PV efficiency (related to the module area), i.e. the removed energy from the module. The usual value of the Absorption coefficient Alpha is 0.9. When possible, the PV efficiency is calculated according to the operating conditions of the module. Otherwise it is taken as 10%. The thermal behaviour is characterised by a thermal loss factor designed here by U (formerly called K-value), which can be splitted into a constant component Uc and a factor proportional to the wind velocity Uv: U = Uc + Uv  · v (U in [W/m ²Ã‚ ·k], v = wind velocity in [m/s]). These factors depend on the mounting mode of the modules. For free circulation, this coefficient refers to both faces, i.e. twice the area of the module. If the back of the modules is more or less thermally insulated, this should be lowered, theoretically up to half the value (i.e. the back side doesnt participate anymore to thermal transfer). Determination of the parameters The determination of the parameters Uc and Uv is indeed a big question. We have some reliable measured data for free mounted arrays, but there is a severe lack of information when the modules are integrated. What value should be chosen according to the air duct sizes under the modules, and the length of the air path? One can observe that the heat capacity of the air is very low. Even with large air vents, the flowing air under the modules may quickly attain the equilibrium with the modules temperature at the end of the duct, leading to no heat exchange at all. Therefore for the top of the array the U value may be the fully insulated U-value; you can have big differences between the regions of the array near the air input, and at the output. The program doesnt take this inhomogeneity of the array temperature into account. On the other hand, the use of the wind dependence is very difficult. On one hand the knowing of the wind velocity is extremely rare. On the other hand the meteo wind velocity (taken at 10 meter height) is not representative of the temperature at the array level (there may be a factor of 2 between them). In this respect the Uv value is obviously not the same for these two definitions of the wind velocity. Default and proposed values The default value is fixed for free-standing arrays, as: Uc = 29 W/m ²Ã‚ ·k, Uv = 0 W/m ²Ã‚ ·k / m/s If you have fully insulated arrays, this should be halved: Uc = 15 W/m ²Ã‚ ·k, Uv = 0 W/m ²Ã‚ ·k / m/s These values suppose an average wind velocity of around 1.5 m/sec at the collectors level. In very windy regions (larger average wind velocities), you can increase the values; but we cannot say by which amount in a reliable way. NOCT Values Some practicians and most of PV modules catalogues usually specify the NOCT coefficient (Nominal Operating Collector Temperature), which is the temperature attained by the PV modules without back coverage under the standard operating conditions defined as: Irradiation = 800 W/m ², Tamb=20 °C, Wind velocity = 1 m/s, Open Circuit. The NOCT factor is related to loss factor U by the thermal balance (from the expression of the top Alpha  · 800 W/m ²  · (1 0) = (Uc + Uv  · 1m/s)  · (NOCT 20 °C). In the definition dialog, the user may define either the U factors or the NOCT. The program immediately gives the equivalence (using Alpha=0.9 and Effic = 10%, without wind dependence). Ohmic wiring losses Ohmic Loss Ratio The Ohmic Loss ratio is referred to the PV array at standard conditions (1000 W/m ², 25 °C), It is the ratio of the wiring ohmic loss Pwir = Rwir * Isc ² compared to the nominal power Pnom(array) = Rarray * Isc ² (SC= short circuit). Where: Rarray = Vmp / Imp at Standard Test Conditions (STC) Rwir = global wiring resistance of the full system. This is computed for a given sub-array as the resistance of all strings wires in parallel, in series with the cables from the intermediate connexion box on the roof to the inverter input. The global wiring resistance Rwir is obtained by putting all the sub-array wiring resistances in parallel. Use in the simulation The Global wiring resistance value finally used during the simulation may be defined here: as an Ohmic Loss ratio (the default value is 1.5% at STC) or given explicitly in mOhm. Wire diameter optimisation and Wiring Resistance Wire sections are determined by the maximum allowable current and the ohmic resistance. Here the proposed diameters are automatically limited to the minimum allowable section, according to the European standards for isolated wires mounted in apparent mounting ducts. Now for a given global loss target (at STC, i.e. maximum operating current), the best section choice is determined by the program in order to minimise: The global copper mass, The ohmic losses behave in a quadratic way with the array current (Ploss = R  · I ²), so that the ratio diminishes linearly with the output current. Therefore the average wiring losses are much lower during the whole running year. Metal resistivity The resistivity of wiring metals is strongly dependent on the temperature, which can widely vary due to dissipating currents. For pure metal, one has: Copper: Rho = 1.68 E-8 * (1 + 0.0068 * Temp [ °C]) [Ohm ·m] Default value: Temp = 50 °C => 22 mOhm ·mm ²/m Aluminium: Rho = 2.7 E-8 * (1 + 0.0043 * Temp [ °C]) [Ohm ·m] Default value: Temp = 50 °C => 33 mOhm ·mm ²/m We use copper which have minimum resistivity. Module quality losses / mismatch Module quality loss It is well-known that most of PV modules series dont match the manufacturer nominal specifications. Up to now, this was one of the greater uncertainties in the PV system performance evaluation. Now, with guaranteed power statements and increasing availability of independent expertise, the situation seems going toward some clarification. Module series are sold with a given tolerance, and actual powers usually lie under the nominal specified power, but stay in the tolerance. We decided that the program default was acceptable. Array mismatch loss Losses due to mismatch are related to the fact that the real modules in the array do not strictly present the same I/V characteristics. The graph below helps for visualising the realistic behaviour of such an array, with a random distribution of the characteristics of short-circuit current for each module. This allows for the quantification of power-loss at the maximum power point, as well as of current-loss when working at fixed voltage. (MPP= maximum power point) Array incidence loss (IAM) The incidence effect (the designated term is IAM, for Incidence Angle Modifier) corresponds to the weakening of the irradiation really reaching the PV cells surface, with respect to irradiation under normal incidence. In principle, this loss obeys Fresnels Laws, (They describe the behaviour of light when moving between media of differing refractive indices. The reflection of light that the equations predict is known as Fresnel reflection), concerning transmission and reflections on the protective layer (the glass), and on the cells surface. In practice, it is often approached using a parameterisation called ASHRAE (as it has become a standard in this American norm), depending on one only parameter bo: FIAM = 1 bo  · (1/cos i 1), with i = incidence angle on the plane. For single-glazed thermal solar modules, the usually accepted value for bo is of the order of 0.1. But in a PV module, the lower interface, in contact with the cell, presents a high refraction index and our specific measurements on real crystalline modules actually indicate a value of bo = 0.05. Final Report for Broome for January

Saturday, January 18, 2020

Outline and Evaluate the Psychodynamic Model of Abnormality

Outline and evaluate the psychodynamic model of abnormality. (12 Marks) The psychodynamic model (which is based on Freud’s theories) states that abnormalities are results of a conflict which has gone wrong in the â€Å"psyche† (in the mind). Freud’s idea states that the psyche – which is made up of the (id, ego and superego), should all work in perfect harmony with each other to avoid being an abnormal person.It is the idea that conscious thoughts and feelings are determined by the unconscious mind, and essentially being mentally healthy requires a good balance between: the id (which controls the desires for which we live for in order to satisfy ourselves), the superego (which takes into consideration morals and the difference between right and wrong) and the ego (which balances the superego and id to keep our behaviour in check).From these 3 components in the psyche, you can quickly see that the id and superego are constantly in conflict. This ultimately means that for a person to not develop a psychological disorder – a strong ego is necessary as it will â€Å"get the best of both worlds† and create a balance, while allowing the superego and id to express themselves (when suitable), without dominating the personality and hence, causing a psychological disorder.An example of an abnormality which could occur from the id being too strong in kids (is developing conduct disorders). In adults (they become psychopaths), all because of the personality being taken over by the id. If the superego is too strong socially acceptable pleasures will be hard to come by as neurotic behaviours such as phobias and obsessions will be apparent, as they will be constantly fixated with things that they want to do but â€Å"cant† because their too scared.Freud thought that the childhood of an individual was essential in the development of personality and that all abnormal behaviours are linked to childhood. There are different ages as sociated with different stages. An example of this is the oral stage which usually happens between (0-18 months) – the focus of pleasure is the mouth (feeding or dummy) and if this is fixated upon, this could lead to overeating or smoking in order to comfort themselves and their mouth. Another example is the anal stage (2-4 years).A conflict may arise when potty training as if the child receives either excessive punishment or the parents are too lenient during this stage it can lead to a fixation which will be taken to adult life. The end result could either be a person who has an anal retentive personality (stubborn perfectionist obsessed with tidiness) or an anal repulsive personality (messy person with no self-control), according to Freud. The evaluation of Freud’s model is that many detailed pieces of data were obtained as it was a case study.The findings did support Freud’s hypotheses and theories. However Freud’s ideas were very subjective as not mu ch – if any scientific data was produced to back his work up. This therefore raises question marks over the reliability of his findings and theories. Also the evidence from the case study came from his own patients who could compel us to think that his results are unreliable, as his patients may have been biased and essentially gave the answers Freud wanted, because they were his patients.

Thursday, January 9, 2020

Underrated Concerns on Custom Term Papers Reviews

Underrated Concerns on Custom Term Papers Reviews Term paper writing is something which hasn't been taught in colleges and universities. Consequently, your papers won't be original as the very same copies will be available to many students. Custom made term papers are essential papers for any students. All in all, they are beneficial for the future studies as well as for the present studies. Likewise the customized paper might be an application for a work vacancy which demands submission within a predetermined period hence prompt delivery is the sole opportunity to make sure a vacancy is booked for interviews and subsequently a work offer. Such companies have a customer service staff that's always readily available to take orders from students and a lot different clients. It's vital that you will commence with any perform whenever possible. Even if student produces all types of things with no assistance, they notice it in their documents. Life After Custom Term Papers Rev iews There are lots of samples of similar CVs in the net, so one may attempt searching for some handy information online. Write my term paper services are offered at custom writing businesses and sites online. Research is really the most important step that permits clients to select the best companies online and find the very best quality write my term paper services. Our Custom Term Papers help includes round-the-clock customer service. The Do's and Don'ts of Custom Term Papers Reviews Custom writing means a critical company with high standards. Custom made content usually means the paper is written based on your wants and standards. The site layout isn't difficult to navigate also. Quality customized papers consist of unique original content. The Meaning of Custom Term Papers Reviews The aim of creating the students do the custom made writing is to make them learn various topics and clarify their concepts so they may discover that it's simple for them to memorize their topics. Once you receive the whole idea of the topic by heart it's possible to choose additional areas in it for more investigation. The major body of the customized term paper involves the precise means of creating the thesis statement with relevant explanations, analytical ideas and quotes from external sources. Broad research makes you to acquire perspective on a certain object and have several sides of its aspects. It can be crucial that you start off with any perform whenever feasible. When you purchase term papers online, there are a number of easy actions that need to be taken to finish your purchase successfully. Subject Selection The very first thing that is essential in starting your Term Papers is selecting your subject of interest. Term papers writing are actually a way to learn about a specific subject better by working on its precise wing. What You Don't Know About Custom Term Papers Reviews Market research papers, I want to guess. It's simple to purchase a research paper in the modern hyper-digital Earth, but you can benefit from our insight. When you compose a research paper you need to unearth things that will be useful for different researchers too. Next time when you're concerned about your academic research paper, just visit. The Hidden Gem of Custom Term Papers Reviews The business hires professionals in various regions of academic writing something which gives students motivation to purchase papers without fear. In case you have any questions, you can get in touch with our friendly support team night and day and get immediate assistance. It's really crucial that you just begin together who has any work as shortly as possible. The custom made term papers are leading learning tool in the present life of students who are more into getting the wisdom of the practical life in contrast to the theoretical facets of the things. When you are finished with the reading, you're prepared to begin the writing. In that situation, t he customized paper writer has to make sure no two custom papers are the very same or else no similar papers ought to be presented to unique clients. Writing a customized paper truly is a challenging task that isn't simple to undertake for just each and every student. Our term paper writing service permits customers to pick the writer they need to work with based on their abilities and assignment requirements. What the In-Crowd Won't Tell You About Custom Term Papers Reviews Based on who've you chosen to compose your papers, they are also able to offer your essay or paper needs in a fast time period. At we let you purchase custom term papers whether you would like. The customized term papers can't be written without the research on this issue. You are going to be able to order affordable custom made term papers. How much does this cost to compose a research paper. Research papers are most likely the most frequent sort of essay out there that. They are a kind of academic writing and as the name suggests. You're welcome to purchase professional customized research papers at EasyGoEssay. Top Custom Term Papers Reviews Secrets You're assured your paper is completed in time, customized, properly formatted, and don't contain a single plagiarized sentence. No matter the academic other sort of paper first things you desire. A term paper is a last work that's written at the conclusion of a class. If you're writing out your paper for the very first time, make sure you determine precise method of its undertaking. Since you may have already guessed, it isn't that easy to discover a cheap customized term paper writing service out there. You could also choose expert customized term paper writing service that will certainly get you satisfied. When you purchase term papers at experienced custom writing service, you can be certain to find the help that's well worth every penny. Customized papers are often original in that the writer doesn't include unoriginal information or information in the custom made paper hence the individual writing the customized paper must be knowledgeable in the topic which is being covered in the custom made paper. Details of Custom Term Papers Reviews It is possible to use any of them and they're never used together. The papers must be completely custom written so they can guarantee academic success and excellence. Consequently, custom papers are free of any sort of cheating as confidentiality must be maintained at the maximum degree possible. The War Against Custom Term Papers Reviews Experienced term paper writers are affordable and they're able to help you acquire the information which you require for your topic. Students have every one of the reasons to obtain academic essays from us. Usually, they face a lot of problems during term p aper writing.

Wednesday, January 1, 2020

Project Management Process Group And Network Tunnel Project

This week was the introductory week. It was a bit overwhelming with all of the information but I have accessed blackboard course outline and course materials. I started reading Channel Tunnel Project case study as part of this week course material. It was an enormously complicated project involving two languages, two governments, numerous subcontractors, and a syndicate of 220 banks which huge cost overruns and delays had severely eroded stakeholder confidence. I believe if more effective communication and teamwork, and more importantly, scope change control system had been in place, those huge claims due to cost overruns and schedule delays wouldn’t have happened. I have also started reading chapter 3 of PMBOK standard 5th edition (PMI,†¦show more content†¦WEEK 2 The focus of the learning material this week is to understand the process and issues involved with handover and commissioning of the project. Throughout the readings and lesson materials, I realized the proper commissioning of building services is crucial to ensure the correct operation of the system and its associated building services plant. It affects both the effectiveness and efficiency of building services and hence the comfort of occupants, and the environmental and financial costs of maintaining it. It is worth mentioning that good commissioning of building services requires specialist skills and knowledge. It also requires an early input in the life of a project, when key decisions relating to the construction process are taken which demands a proper commissioning management. The main objective of commissioning management is to manage the overall pre-commissioning and commissioning activities, including programming and co-ordination of energizing the installation, to achieve the project completion date. Based on what I have learnt from the heavy construction projects that I have been involved so far, the key requirements to successfully commission a building, service or product can be summarized as follows: †¢ There should be a sufficient time to complete the pre-commissioning and commissioning activities. †¢ A commissioning management team should be formed early in the design and construction process to advise on